|
The Building Process

This is a picture of the Powerwheels™ base I found for
CESAR's platform
   
After a little... or perhaps a lot of cleaning and
painting, CESAR started to take form.
 
     
These pictures
show (from top left to bottom right) me working on the drive train, the
steering mechanism, the switch interface chip, early work on the steering
and interior of the robot, the activewire™ board, the main battery and
front hood, the completed steering system and interior, and the rear of
the robot.
The Final Product

     
     
 
Pictures taken
at Venice Beach, CA; Roxbury Park, Beverly Hills; and Franklin Canyon, Los
Angeles
|